Horizon 2040 Master Timeline

2026 – 2035

System Architecture & Foundational Alignment

The drafting and negotiation epoch. Establishing ironclad routing matrices, defining municipal compliance protocols within Collin County, and locking down technical rulesets before physical procurement occurs.

Key Targets:

  • Finalizing Title VI Civil Rights firewalls and operational safety protocols.
  • Structuring municipal data sovereignty rules to block automated commercial tracking.
  • Refining terminal location maps and staging platform geometry.
2036

Global Vehicle Sourcing & Asset Acquisition

The hunting window opens. Direct inspection, procurement, and purchasing of the 134-unit manual-transmission commercial fleet across the Dubai and Tokyo hubs as targeting filters capture compliant 2011/2012 model years.

Key Targets:

  • Securing 50 LHD manual Toyota Coasters and 25 LHD HiAces via GCC channels.
  • Bidding on compliant JDM manual assets (Probox, TownAce, Pixis) at Tokyo auctions.
  • Ensuring all chassis configurations meet the absolute 25-year NHTSA import exemption criteria.
2037

The Convoy & McKinney Depot Staging

Transoceanic delivery logistics. The complete 134-vehicle asset pool arrives at the Port of Houston and shifts north to the system's operational heartbeat for retrofits and driver training.

Key Targets:

  • Executing deep mechanical overhauls and custom Recaro seating installations.
  • Activating the McKinney Technical Depot HQ closed training pads.
  • Launching the Manual Transmission Operator Certification curriculum for RHD and LHD assets.
2038

Transit Centre Heavy Infrastructure Build

Concrete, steel, and structural execution. Civil engineering teams begin formal construction of the 9 primary regional connection nodes across the North Texas footprint.

Key Targets:

  • Constructing high-capacity terminal loops at McKinney, Allen, Frisco, and East Plano.
  • Erecting express platform link architecture at Princeton, Lucas, Sachse, Murphy/Wylie, and Prosper/Celina.
  • Integrating mechanical yard loops and secure staging areas.
2039

Peripheral Network Saturated Construction

Micro-infrastructure distribution. Outfitting the arterial capillaries of the transit network to ensure safe, localized neighborhood access points line every active route vector.

Key Targets:

  • Deploying physical wayside markers and retrofitted all-weather boarding shelters.
  • Installing standalone, hardware-isolated ticket validation ticket kiosks.
  • Finalizing physical street alignment markings and dedicated transit slip lanes.
2040

Full Network Launch & Operational Cutover

System activation. The entire 134-chassis stick-shift fleet enters live passenger service, fully establishing the Luxury Metro and AeroExpress lines across Collin County lanes.

Key Targets:

  • Commencing high-frequency, point-to-point premium passenger routes.
  • Activating full contractor shuttle tiers for localized event routing loops.
  • Proving the structural stability of premium, driver-focused public transport.